Announcement of Pre-Qualification Result Development of Marine Observation Infrastructure and Forecasting Technology for Maritime Meteorological System 2

  • Ceppy Anggara
  • 26 Agu 2021

Based on the results of the pre-qualification evaluation and the No Objection Letter (NOL-2nd) from Agence Francaise de Development (AFD). It is hereby announced that the pre-qualification stage is followed by 2 (two) participants and results in a decision as in the attachment.

The next schedule is the qualification objection period from 27th August 2021 until 9th September 2021 which can be submitted via email ulp@bmkg.go.id

Thus this announcement is made and constitutes an integral and inseparable part of the procurement document, so that it can subsequently be used properly

Jakarta, August 26th 2021
Unit Layanan Pengadaan
Sekretariat Utama

Kelompok Kerja Strengthening Climate and Weather Services Capacity Phase II

- Klik tautan ini jika PDF di atas tidak muncul.

Latest Earthquake

  • 16 April 2024, 23:10:22 WIB
  • 2.1
  • 15 km
  • 2.55 LS - 120.79 BT
  • Pusat gempa berada di darat 42 km BaratLaut Luwu Timur
  • Felt (MMI Scale): II Mangkutana
  • Read More →
  • Pusat gempa berada di darat 42 km BaratLaut Luwu Timur
  • Felt (MMI Scale): II Mangkutana
  • Read More →